Wiadomości PRO
Economy

Poland to expand toll road network by 880 km from March 2027

✍ Redakcja Wiadomości PRO 📅 👁 21
The Ministry of Infrastructure plans to expand the e-TOLL network by 880 kilometers starting March 16, 2027. Once the new regulations take effect, the total length of toll roads in Poland will increase from nearly 5,900 to approximately 6,750 kilometers.
No time to read? Our AI narrator will read it to you. About 3 min.
At the end of the article: adapt this text to yourself (simpler, shorter, more detail) and ask a question about it — we answer only from this article.
Poland to expand toll road network by 880 km from March 2027
AI illustration

The Ministry of Infrastructure has prepared a draft regulation under which the e-TOLL system will expand by 880 km of motorways, expressways, and national roads starting March 16, 2027. The toll obligation will primarily apply to trucks and buses, while passenger cars will remain exempt. The government document is expected to be officially adopted by the Council of Ministers in the fourth quarter of 2026.

Ministry of Infrastructure project and schedule of changes

Currently, the toll collection system operates on approximately 5,870 km of expressways and national roads. In the spring of 2027, the total length of toll sections will reach nearly 6,750 km.

The infrastructure ministry explains that this further expansion is part of the state's transport policy. The network extension is intended to optimize freight transport and maintain a balance between road and rail transport.

Who will be affected by new tolls and where will funds go

Electronic toll collection under the e-TOLL system applies to vehicles with a maximum permissible weight exceeding 3.5 tons and to buses. Passenger cars are not covered by the e-TOLL system on these routes and only pay for travel on a few sections of the A1, A2, and A4 motorways.

All new revenue generated from tolls will go to the National Road Fund. The state uses this source to finance investments in road infrastructure, including the construction of new routes and the ongoing maintenance of the existing network.

Network expansion from February 2026

The previous change to the system took effect on February 1, 2026. At that time, e-TOLL expanded by approximately 645 kilometers, and the total length of toll routes increased from 5,225 to nearly 5,870 kilometers. Simultaneously, rates for trucks and buses were increased by 40–42 percent, depending on the vehicle category.

The February amendment included, among others, a section of the A2 motorway between Kałuszyn and Siedlce, selected sections of the S1, S3, S5, S7, S11, S12, S14, S16, S17, S52, and S61 expressways, and fragments of the DK8, DK12, DK50, and DK91 national roads. These changes were motivated by the need to bring Polish rates closer to levels in other European countries.

According to estimates from the Regulatory Impact Assessment, revenue from the e-TOLL system for the entire year 2026 will reach nearly 6.6 billion PLN.

Sources

Article prepared with the help of artificial intelligence based on: RMF24, Business Insider Polska, Puls Biznesu. Facts checked automatically against these sources. The Wiadomości PRO newsroom is responsible for this publication.

This text adapts to you
Have a question about this text? Ask.
We look for the answer in this article first. If it is not there, we check press sources and link them. We do not invent.

Read more in Economy

Comments (0)

The page is more interactive when you sign in with Google Your name is filled in automatically, and commenting is faster and safer.
Your comment will appear after the newsroom approves it.

Loading comments...

← Back
× This page adapts to you

Wiadomości PRO is a portal built from widgets — rates, reminders, quiz, weather. You choose what you see.

See widgets →
Share
Link copied